EPC or PPA
Choose the right model for your solar project.
We believe that each client has specific needs. Therefore, we offer two different modalities for implementing your solar energy project: EPC (Engineering, Procurement, Construction) and PPA (Power Purchase Agreement).
With both options, we guarantee solutions that combine efficiency, sustainability and financial benefits.
what are the differences?
EPC model
In the EPC model, Go Solar takes charge of the entire process, from design to construction of your solar energy project. The client assumes full control of the infrastructure once it is completed and can opt for an Operation and Maintenance (O&M) contract to ensure optimal operation throughout its lifespan.
PPA model
what is it?
With the PPA model, Go Solar develops, manages and operates the project until the investment is written off. During this period, the client benefits from energy at a reduced cost, without any initial investment. After the write-off, the control of the asset is transferred to the client.
EPC model
Engineering, Procurement, Construction
- Full control: The customer owns the infrastructure from the beginning.
- Customized solution: We design according to your needs.
- Guaranteed quality: We are responsible for both the execution and delivery.
PPA model
Power Purchase Agreement
- No initial investment: Ideal for companies that want clean energy without immediate costs.
- Delegated management: Go Solar operates and maintains the system.
- Cost predictability: Fixed tariffs for the duration of the contract.
the best solution for you
We design the ideal model for your project. Transform your energy into savings and sustainability.
contact us
We will contact you as soon as possible.

